Before you start

The things to take away.

  • Underlayment is the roof's second barrier: it keeps wind-driven rain off the deck when water gets past the shingles.
  • Each kind has its own standard: felt (ASTM D226, No. 15 or No. 30), synthetic (ASTM D8257) and self-adhered membrane (ASTM D1970).
  • The code asks for one layer on slopes of 4:12 and steeper, and two layers or a self-adhered membrane from 2:12 up to 4:12.
  • Products limit how long they can sit in the sun; CertainTeed's synthetic covers sun damage only within 90 days. Shingles should go on as soon after the underlayment as possible.
  • Under tile, the underlayment is the real waterproofing: the tile lasts 50 years or more, the underlayment 20 to 25.

The layer nobody sees.

Shingles, tile and metal get the attention. Under every one of them sits the underlayment, a sheet fastened to the wood deck before the roofing goes on. When wind lifts a shingle, when a storm drives rain sideways, or when a flashing lets go, the underlayment is what keeps water off the wood until the roof is put right.

This guide covers the kinds of underlayment by the standard printed on the roll, what the building code asks for on each slope, how long a sheet can sit in the sun, what goes under tile and metal, and how to read the underlayment line on a quote. For where it sits in the whole roof, see the parts of a roof; for the rest of a bid, see how to compare roofing estimates.

What underlayment does.

The Asphalt Roofing Manufacturers Association, the trade body of the shingle makers, starts its bulletin on underlayment with a plain rule: asphalt shingles should not be installed directly on a wood deck. Its reasons, in short:

  • It is a second barrier under the shingles, there for the wind-driven rain the shingles let through.
  • It keeps the deck dry between tear-off and the last course of shingles.
  • Building codes require it, and the shingle makers set requirements for it.
  • It is part of what gives a shingle roof its fire rating.
  • It hides small differences in the thickness of the deck sheets, which otherwise show through as a grid on the finished roof, and it keeps resin in the wood away from the shingles.

The kinds, by the standard on the roll.

Each kind has its own standard, and the code requires the felt and membrane standards to be labeled on the product, so the roll tells you what it is. These are the ones you will see on a Texas roof.

  • Asphalt-saturated felt (ASTM D226). The traditional sheet, made of organic felt soaked in asphalt. Type I is the lighter weight roofers call No. 15 felt; Type II is the heavier No. 30. It sheds water, but it also absorbs some and lets some vapor through.
  • Steep-slope felt (ASTM D4869). The first standard written for steep-slope underlayment, with four weights and a water-shedding test the industry calls the shower test.
  • Felt with inorganic fibers (ASTM D6757). Looks and works like felt, uses less asphalt, and may hold its shape better.
  • Synthetic underlayment (ASTM D8257). Polymer sheets fastened with nails. Lighter than felt, and a roll covers more roof. The 2021 code's table for shingles names only the felt standards, so a synthetic should come with its approval for use under shingles.
  • Self-adhered membrane (ASTM D1970). Rubberized asphalt with a sticky back, sold as ice and water shield. It bonds to the deck and seals around the shank of every nail driven through it.

What the code asks for, slope by slope.

Texas cities adopt the International Residential Code as their residential building code, and its underlayment rules turn on the slope of the roof.

  • 4:12 and steeper. One layer, laid like shingles from the eave up, each course lapped 2 inches over the one below, end laps of 4 inches, and end laps staggered 6 feet apart.
  • From 2:12 up to 4:12. Two layers: a 19-inch strip along the eave, then 36-inch sheets, each overlapping the one below by 19 inches, so every point on the deck is covered twice. The manufacturers' association names one layer of self-adhered membrane as the other way to do it.
  • Below 2:12. No asphalt shingles at all. A roof that flat needs a low-slope system.
  • High-wind areas. Where the code requires wind design, the lighter felts drop out: the sheet must be ASTM D226 Type II or ASTM D4869 Type III or IV.

The code's ice barrier rule, a cemented or self-adhered strip reaching 24 inches inside the wall line, applies only where the local code table records a history of ice forming at the eaves. We use self-adhered membrane on Texas roofs for a different reason: it seals the places where water gathers and wind drives it sideways.

Felt or synthetic?

Felt is named in the code's own table. Synthetics are newer, and the manufacturers' association warns that some of the products it lists may not be approved by the codes in force everywhere, so ask for the approval. On the roof, the association notes that felt absorbs some moisture and lets some vapor through, while synthetic sheets are lighter and cover more of the roof from each roll.

We cover the deck with synthetic underlayment on every roof. If a quote says only "underlayment", ask which product: the label on the roll decides which standard it meets.

Where the self-adhered membrane goes.

Membrane costs more than felt or synthetic, so it goes where it earns its keep. The manufacturers' association lists the places: the eaves, the valleys, the hips and ridges, and around every penetration, from plumbing vents and skylights to chimneys. On a Mammoth roof, Igloo Shield™ ice and water shield goes at every eave and valley and around every penetration, and Pelt Felt™ synthetic underlayment covers the rest of the deck.

Membrane over the whole deck is a different case. The association warns that a fully adhered deck acts as a vapor retarder, so attic ventilation becomes more important, not less: without it, water vapor can condense under the deck. That matters on the roofs where we do cover the whole deck, such as under metal, and it is one reason we size the attic vents on every job. Our ventilation guide covers the rule.

How long underlayment can sit in the sun.

Every underlayment has a limit on how long it can be left uncovered, and the limit is set by the product, not by a general rule. The manufacturers' association says shingles should go on as soon as possible after the underlayment. The makers put numbers on it in their warranties.

CertainTeed's warranty for its RoofRunner synthetic underlayment, for example, excludes damage from exposure to the weather, except sun damage on a sheet that was covered within 90 days; its RoofRunner AIR version is made to resist ultraviolet light for up to 180 days. Most single-story homes we reroof are finished in one day, so on our jobs the question rarely comes up. On a job that stalls for weeks with the underlayment showing, it should.

Under tile and under metal.

On a tile roof, the underlayment is the real waterproofing. Clay and concrete tile lasts 50 years or more, but the underlayment under it gives out at 20 to 25, and when it does the roof leaks while the tile looks fine. The fix is a re-lay: the tile comes off, the deck is checked, a high-temperature membrane and new flashings go down, and the same tile goes back on. Our tile roofing page covers how we do it.

Under metal, the whole deck gets a high-temperature underlayment instead of standard felt, a stronger second barrier beneath the panels. The details for each metal system are on our metal roofing page.

Underlayment and the warranty.

The underlayment usually carries a warranty of its own, and it often follows the shingles. CertainTeed's RoofRunner warranty runs for the same length as the CertainTeed shingles installed over it, and for ten years under another maker's shingles. It ends if either the underlayment or the roofing over it is removed, and it excludes failures caused by poor attic ventilation.

The shingle warranty cares about it too. The manufacturers' association tells installers to follow the shingle maker's requirements for the underlayment, and CertainTeed's shingle warranty excludes damage from any installation that does not follow its instructions. A crew that lays one layer on a 3:12 slope has built outside the code and put the maker's coverage at risk. Our guide to roof warranty types explains what each document covers.

A worked example: one house, two slopes.

Picture a ranch house with a main roof at 6:12 and a covered patio off the back at 3:12. Same shingles, same crew, same day, two different underlayment jobs.

  • The main roof (6:12). Membrane along every eave and in both valleys and around the vent pipes, then one layer of synthetic underlayment over the rest, lapped 2 inches course over course with 4-inch end laps staggered 6 feet apart.
  • The patio roof (3:12). Below 4:12, so two layers: a 19-inch starter strip at the eave, then 36-inch sheets lapped 19 inches over each other, or one layer of self-adhered membrane over the whole patio deck. Where the patio roof meets the house wall, membrane runs up behind the step flashing.

A quote for this house should show both. If it lists one line, "synthetic underlayment, whole roof", ask how the patio is being done, because the slope there changes the rule.

Reading the underlayment line on a quote.

  • The product by name, so you can look up its standard and its warranty.
  • Where the self-adhered membrane goes: eaves, valleys, walls, penetrations.
  • Whether the main underlayment covers the whole deck.
  • How any slope under 4:12 is handled: two layers or membrane.
  • For tile or metal, the high-temperature membrane and whether it covers the whole deck.

"Underlayment as needed" is not an answer. Ask until the line names a product and a place.

Frequently asked

Is roof underlayment required by code in Texas?

Yes, wherever a city has adopted the International Residential Code, which Texas cities use as their residential building code. The code names the standards an underlayment must meet and how it is laid on each slope.

What do No. 15 and No. 30 felt mean?

They are trade names for the two weights of asphalt-saturated felt in the ASTM D226 standard. No. 15 is Type I, the lighter one. No. 30 is Type II, the heavier one, and one of the sheets the code accepts where wind design applies.

How long can underlayment be left uncovered?

Only as long as the product's own limits allow. CertainTeed's RoofRunner warranty, for one, covers sun damage only on a sheet that was covered within 90 days, and its AIR version is rated for 180. Shingles should go on as soon as possible.

Does a low-slope porch roof need different underlayment?

Yes. Between 2:12 and 4:12 the code requires two layers, laid with a 19-inch overlap, or one layer of self-adhered membrane. Below 2:12, shingles are not allowed at all.

Is synthetic underlayment better than felt?

Felt is named in the code's own table, and a synthetic should come with its approval for your area. Synthetic is lighter and covers more roof per roll, and it is what we lay over the whole deck on every roof.

Should the underlayment be replaced on an old tile roof?

Usually, yes, once it starts to fail. The tile can last 50 years or more, but the underlayment under it typically lasts 20 to 25. A re-lay replaces the underlayment and puts the same tile back.

Sources and notes

  1. Asphalt Roofing Manufacturers Association, "Steep Slope Roofing Underlayment", technical bulletin, May 2025 (no shingles directly on a wood deck; the ASTM families; No. 15 and No. 30 felt; why underlayment matters; where membrane goes; a fully adhered deck as a vapor retarder; follow the shingle maker's requirements; some products not approved by every local code): asphaltroofing.org
  2. International Code Council, International Residential Code, 2021 edition: R905.1.1 and Tables R905.1.1(1) to (3) (labels; the felt standards named for shingles; application by slope; the wind-design requirement), R905.1.2 (ice barriers), R905.2.2 (shingles only at 2:12 or steeper): up.codes
  3. Texas Local Government Code §214.212 (the IRC as the municipal residential code): statutes.capitol.texas.gov
  4. CertainTeed, RoofRunner and RoofRunner AIR Underlayment 2023 Limited Warranty (same term as CertainTeed shingles, ten years under others; ends if the roofing is removed; exposure excluded except ultraviolet damage within 90 days; AIR resists ultraviolet light up to 180 days; poor ventilation excluded): the warranty document
  5. Mammoth Roofing & Exteriors: the warranty (Igloo Shield™ and Pelt Felt™), tile roofing (tile 50 years or more, underlayment 20 to 25), metal roofing (a high-temperature layer over the whole deck), roof replacement (most single-story homes finished in one day). First published in September 2024 as "What Is the Best Underlayment for Roofing" and rewritten in November 2026.

Want to know what is under your shingles?

The free Roof Grade starts in the attic, where a failing underlayment shows first as stains on the deck. We photograph what we find and put any work it needs in a written price.

Get a free Roof Grade